Aluminum Pipe Line Delivery and Inspection Process – Wuxi
-
In September 2024, together with our Turkish client, we conducted an on-site inspection in Wuxi, China, to review the current status of the aluminum pipe production line previously purchased. The overall condition of the machine was assessed, missing parts and pending details were identified and clarified with the manufacturer. Technical steps required to prepare the line for delivery were accelerated. During face-to-face meetings with the supplier, the production schedule for missing equipment, installation details, and shipment timeline were finalized. Additionally, the delivery schedule was monitored on-site to ensure it met the designated freight date.
Services Provided Throughout the Process:
🛬 Reception and transportation arrangements at Shanghai Airport
🗣️ Chinese–Turkish technical translation and meeting support
🔍 Inspection of the current status of the machine line; identification of missing parts and detailed discussions with the supplier
🔧 Follow-up on the completion of missing components and acceleration of production
🚚 Freight planning and coordination of all preparations until the loading date
🔄 Continued factory visits after the client’s return to Turkey to ensure shipment completion on the scheduled date
Field Photos and Moments from the Process
Inspection and Technical Evaluation of the Ordered Line
-
In Wuxi, we conducted an on-site review of the current status of the aluminum pipe production line previously ordered by our client. Missing parts and sections requiring completion were identified. Technical procedures to be completed before delivery were clarified through direct discussions with the supplier. Throughout the process, the manufacturer’s preparation status was closely monitored, and production was expedited.



Parts Completion Process and Shipment Preparation
A detailed plan was developed with the manufacturer to complete the missing parts. Both technical and logistical processes were coordinated on-site to ensure all preparations were thoroughly completed before shipment. All steps were closely monitored to meet the designated freight date.